Roadways

Whether it is a major highway new construction, expansion, renovation or reconstruction, NAHAJ AL-KHAIR provides clients with precise organizational planning and swift execution while exceeding clients’ expectations.

01011010.PNG

Preparation Study And Design For Al-Thubat Interchange In City Of Kut – Governorate Of Wasset

​

Client: Ministry of Municipalities and Public Work (MMPW), Republic of Iraq. The interchange is located on the main highway in the heart City of Kut, one of the major cities in southern Iraq. The purpose of the project is to reduce the number of fatal accidents that occur almost daily to the highway which connects the ports of southern Iraq with the capital passing within high population areas. The scope of the project includes:

  • providing the client with geometry and utilities survey

  • traffic study

  • soil investigations

  • feasibility & technical study

  • geometry

  • structural

  • electrical & sewer plans

  • specifications & bill of quantities

Abdallah Abu Najm Road - Mamlaha

​

New construction of 2nd carriageway 18.2km length and construction of three new bridges over rivers in Mamlaha – Samawa. Project includes construction two lanes for 2nd corridor in two segments. First segment Samawah/Mamlaha/Abdallah Abu Najim Road in Al Muthanna Governorate length 18.2km. Second segment the road of the Al Doh Cement Plant length 3 km, width 8m with two sides shoulders 3m wide, and new construction of three bridges to reduce traffic jams. Bridges are Slibat Bridge over Al Qadissiya River, Bridge of Al Doh Cement Plant. Each bridge is 5 spans, 20m length, 6 piers, three columns for each pier, drill shafts 1.5m diameter, concrete girders pre-stressed pre-cast 20m length and 85cm height. Over Railroad Bridge 3 spans 20m length for 1st and 3rd span and 26m length for the 2nd span, 4 piers, pre-stressed pre-cast girders 26m length. This corridor will serve residents in Mamlaha and Salman Counties and serves quarries and cement plant areas, which will reduce loads and traffic jams on the existing roads currently used by heavy trucks and semis, eliminate flooding during rainy seasons, also this corridor is the first stage of Samawa – Najaf main road which leads to Saudi Arabia borders, corridor serves tourists and tourism as it leads to Sawah Lake.

0011001.PNG
0101.PNG

Additional Projects

  • Preparation Study and Design for Rumaytha Interchange In City of Rumaytha – Governorate of Al-Muthanna: Client: Ministry of Municipalities and Public Work (MMPW), Republic of Iraq.

  • Al Khidhir – Al Darraji Road – New construction and pavement of AL Khidhir – Al Darraji Road 20 km length and 6 m wide.

  • Al Fartous Road rehabilitation – Construction and maintenance for Al Fartous Road rehabilitation 7.5 km length.

  • Al Warkaa – Al Rumaitha Road – Construction and maintenance for Al Warkaa – Al Rumaitha – Al Bo Huaicheema Road 9.5 km length.

  • General Services Area in Al Darraji – Rehabilitate, repair and pavement of roads in General Services Area in Al Darraji.

  • Dbees – Al Smeech – AL Warkaa Road – Construction and maintenance of Dbees – Al Smeech – AL Warkaa Road 5 km length.

  • Cleaning work was carried out for Al Wahda Municipality (Nahrwan, Al-Huriyah Village, Village 9, Village 10) and was completed in 2010.

  • Sterilization materials and tools for the operating communities have been equipped and have been completed in 2010.

  •  The installation and installation of the water unit was carried out in a combined number of 2 hours, 200 m3/h, in the village of Bismayah and the neighboring villages. It was completed in 2010.

  •  The cars of the model (6) and the normal model (6) model 2011, the type of chavrlet Suburban and the Corla (8) model are equipped with the General Secretariat of the Council of Ministers and were completed in 2011.

  • The construction of the water collection tank with the pumping station and the conveyor lines / Akrkof has been completed in 2011

  • The replacement of the electricity network of Al-Kamaiya area was implemented and equipped by Al-Kamaiya area by it. This achievement was completed in 2021.

  • The replacement of the Kamaliya area electricity network has been implemented and equipped to replace it 759, and this was done in 2021.

  • The referral of the payment line pipeline contract for the second wing R2 in Husseiniya was carried out in 2013.

  • The referral and contract of equipping a water network in Al-Jawadin district has been completed and this was done in 2013.

  • The referral and contract for the replacement of the water network in Al-Jawadin district was implemented and this was done in 2013.

  • The referral and contract for the development of the Mahmoudiya ext. This was done in 2013.