AL Rumaytha Overpass

New design and construction of Rumaytha Entrance overpass includes preparation of all designs, traffic studies , surveys, preliminary design of construction , diversion road ,implementation an intersection and the old road inside Rumaytha Entrance connects between the intersection and the old road inside Rumaytha city. Deliver and install 42 concrete pre-cast piles 30*30 cm for each pier and a total of eight piers of the bridge, and the implementation of pile caps and columns and walls of the  main approaches.

Work also includes deliver and install in-house pre-cast  pre –stressed girders 20 m long and 85 cm high with total of 19 girders for each span, asphalt works, implementation of main roads and service roads, aqueduct service culverts, sewer, and storm water and furnishing. Bridge opened to public in 2010.